Sample Response Letters
Sample 1: Acknowledge & Commit to Repair
[Contractor Business Name]
[License # XXXXX]
[Address]
[Phone]
[Date]
[Homeowner Name]
[Address]
RE: Response to Your Letter Regarding Defects
Project: [Address] - [Kitchen Remodel]
Dear [Homeowner]:
Thank you for your letter dated [Date] identifying issues with the work we completed.
I take quality seriously, and I want to address your concerns promptly.
RESPONSE TO YOUR ITEMS:
1. PLUMBING LEAK UNDER SINK:
I agree this needs to be repaired. I will send my plumber to inspect and repair the leak within 3 business days. This is covered under our one-year warranty.
2. CABINET DOORS MISALIGNED:
I inspected this issue and agree the doors need adjustment. I will return on [Date] to realign all cabinet doors and ensure they close properly.
3. GROUT CRACKS IN TILE:
I reviewed the photos you sent. The hairline cracks appear to be settling cracks common in new tile installations. However, I will re-grout the affected areas to ensure a perfect finish. This will be completed within 5 business days.
4. PAINT TOUCH-UP NEEDED:
Agreed. I will return to touch up the paint areas you identified.
SCHEDULE:
I will complete all repairs as follows:
• [Date]: Plumbing leak repair
• [Date]: Cabinet door realignment and paint touch-up
• [Date]: Tile re-grouting
COMPLETION & SIGN-OFF:
Once all items are completed to your satisfaction, I request that you sign off on the final completion certificate and release the $[Amount] final payment that is currently withheld.
I appreciate your patience, and I'm committed to ensuring you are 100% satisfied with the project.
Please confirm the above schedule works for you.
Sincerely,
[Your Signature]
[Your Name]
[Contractor License #]
Sample 2: Mixed Response (Some Valid, Some Not)
[Contractor Business Name]
[License #]
[Address]
[Date]
[Homeowner Name]
[Address]
RE: Response to Defect Claims
Project: [Address]
Dear [Homeowner]:
I am responding to your letter dated [Date] claiming defects in the work I performed.
ITEMS I WILL ADDRESS:
1. ELECTRICAL OUTLET NOT WORKING (Master Bedroom):
I agree this needs to be fixed. I will have my electrician inspect and repair within 5 business days. This is covered under warranty.
2. CROWN MOLDING GAP:
I inspected the gap you identified. I will return to fill and repaint this area.
ITEMS THAT ARE NOT DEFECTS:
3. "UNEVEN FLOOR":
You claim the new hardwood floor is uneven. I hired an independent flooring inspector who measured the floor on [Date]. His report (attached) confirms the floor is within NWFA (National Wood Flooring Association) standards for flatness (3/16" over 10 feet). The floor meets industry standards and contract specifications. The slight variation you're noticing is normal and does not constitute a defect.
4. "WRONG SHADE OF PAINT":
You claim the paint color is "not what you wanted." The contract specifies [Paint Brand, Color Name, Color Code]. I used exactly that product. You approved the color sample on [Date] (see attached email). The paint color matches the contract. If you want a different color, that is a change order, not a defect. I'm happy to repaint for an additional fee of $[Amount].
ITEMS OUTSIDE CONTRACT SCOPE:
5. "DRIVEWAY CRACKS":
You demand I repair cracks in your driveway. My contract was for [interior remodel only]. I did not work on the driveway. This is not my responsibility. The cracks were present before I started (see attached photos from [Date]).
PAYMENT:
I completed all work per the contract specifications on [Date]. You are withholding $[Amount] final payment. I will repair items 1 and 2 listed above (legitimate warranty items) within 5 business days.
Items 3, 4, and 5 are not defects or are outside my scope. I request that you release the $[Amount] final payment within 10 days. If payment is not released, I will file a mechanics lien and pursue legal action for breach of contract.
Sincerely,
[Your Signature]
[Your Name]
Attachments:
- Flooring inspector report
- Email showing paint color approval
- Photos of driveway pre-construction
Sample 3: Full Defense (Meritless Claims)
[Contractor Business Name]
[License #]
[Address]
[Date]
[Homeowner Name]
[Address]
RE: Response to Your Defect Claims – No Defects Exist
Project: [Address]
Dear [Homeowner]:
I am responding to your letter dated [Date] demanding $[Amount] for alleged defects. Your claims are without merit.
CONTRACT PERFORMANCE:
I completed all work per our contract dated [Date]. The contract required [scope of work]. I performed all work in a good and workmanlike manner using materials meeting or exceeding contract specifications.
All work passed final inspection by [City] Building Department on [Date] (see attached inspection certificate).
YOUR ALLEGED DEFECTS:
You claim the following are defects:
1. "TILE LIPPAGE":
You claim tiles are uneven. Industry standard (ANSI A108.02) allows up to 1/32" lippage for tiles under 15" and 1/16" for tiles over 15". I measured the lippage on [Date]. Maximum lippage is 1/32", which is well within industry standards.
2. "CABINET GAPS":
You claim gaps between cabinets and walls are "too wide." The contract does not specify gap measurements. Standard practice is to leave 1/8" - 1/4" gaps to allow for wall irregularities and to avoid cracking cabinets. The gaps are normal and will be covered by trim (which you declined as an optional upgrade).
3. "PAINT NOT PERFECT":
You claim paint has "slight imperfections." You are holding us to an impossible standard. Minor brush marks, slight variations in sheen, and small areas of texture are normal in paint application. The paint job meets industry standards for residential work.
EXPERT OPINION:
I hired an independent general contractor, [Name, License #], to inspect your alleged defects. His report (attached) concludes: "All work meets or exceeds industry standards. No defects observed."
CONCLUSION:
Your claims are based on unrealistic expectations, not actual defects. I fulfilled all contract obligations. The work is of high quality and meets all applicable codes and standards.
DEMAND FOR PAYMENT:
You are withholding $[Amount] final payment. I demand immediate release of this payment within 10 days.
If you do not release payment within 10 days, I will:
• File a mechanics lien on your property
• Sue for breach of contract seeking the withheld payment plus attorney fees and costs
• File a complaint with CSLB regarding your wrongful withholding
Release payment immediately.
Sincerely,
[Your Signature]
[Your Name]
Attachments:
- Building inspection final approval
- Independent contractor inspection report
- Photos of completed work showing quality